Knowledge hub

Software development blog and guides

This is the Timeline Digital software development blog: straight answers on architecture, SEO, and product delivery, written in plain language for the people who have to make the decision, not for search engines.

Articles
253
Topics
15
Latest article
Nov 14, 2026

Latest articles

New articles on custom software, process design, and the technology decisions that move the needle.

Timeline Restaurants POS: sales summary with orders, gross and net sales, average ticket, tax and tips

POS Software

Restaurant Daily Sales Report: What to Track + Template

A restaurant daily sales report is a one-page summary of a day of trading: orders, gross and net sales, average ticket, tax, tips, discounts, sales by category, best sellers, payment mix and voids. This guide defines each number, shows what to do with it, and gives a template you can copy.

Nov 14, 202611 min readRead

POS Software

What Is a POS System? Meaning, Parts and How It Works

A POS system is the software and equipment a business uses to record a sale and take payment. This guide explains what POS and EPOS mean, the parts of a POS system, how an order flows through one in a restaurant, installed versus cloud POS, and what to check before you choose.

Nov 14, 202611 min readRead

Printer settings screen in Timeline Restaurants POS, showing the receipt printer connection choices, the kitchen printer and the cash drawer option

POS Software

Thermal Receipt Printer Guide: 58mm vs 80mm for Restaurants

A thermal receipt printer prints by heating coated paper, so it needs no ink. This guide explains 58 mm versus 80 mm paper, how a printer connects to a POS, what ESC/POS means, how the cash drawer opens through the printer, and how to choose one for a restaurant.

Nov 14, 202612 min readRead

POS Software

Cash Drawer Count Sheet: How to Count a Till, Open and Close

A cash drawer count sheet lists each note and coin, how many you have and the total, so you can compare counted cash with expected cash. This guide gives a sheet you can copy, the expected cash formula, over and short checks, and the same routine in the free Timeline Restaurants POS.

Nov 14, 202611 min readRead

Printed production job card from Timeline Factory Manager showing product, quantity to make, materials required and a daily production table

Manufacturing Software

How to Make a Job Card for Production (Format and Filled Example)

A job card tells the shop floor what to make, how many, from which materials, and gives them a place to write what was made and rejected. Here is the format, a filled example and three ways to make one.

Nov 14, 20267 min readRead

New product form in Timeline Factory Manager with a bill of materials listing each raw material and quantity per unit

Manufacturing Software

What Is a Bill of Materials (BOM)? Definition and Worked Example

A bill of materials lists every material needed to make one unit of a product, with the quantity of each. Here is a plain definition, a worked example and the mistakes that make a BOM wrong.

Nov 14, 20267 min readRead

Timeline Factory Manager dashboard showing units made in the last 7 days, open sales orders, work orders and low stock

Manufacturing Software

Excel vs Manufacturing Software: When Should a Small Factory Switch?

Excel is fine for a small factory until stock has to change every time production happens. Here is where spreadsheets work, where they break, and the three stages most factories move through.

Nov 14, 20267 min readRead

Raw materials list in Timeline Factory Manager showing on hand, reserved, available and on order quantities with low stock marked

Manufacturing Software

How to Track Raw Material Stock and Set a Reorder Level

Track four numbers for every raw material: on hand, reserved, available and on order. Then set a reorder level so you buy before a job stops. Here is how, with worked examples.

Nov 14, 20267 min readRead

Work orders list in Timeline Factory Manager with product, quantity, progress and status

Manufacturing Software

Best Free Manufacturing Software for Small Business in 2026 (4 Types Compared)

Free manufacturing software comes in four types, and each one is free in a different way. Here is what each type is good for, what to watch for, and how to choose.

Nov 14, 20268 min readRead

Sales order page in Timeline Factory Manager showing ordered, in production and delivered quantities for each line

Manufacturing Software

Sales Order vs Work Order vs Purchase Order: Factory Documents Explained

A sales order comes from a customer, a work order goes to your factory and a purchase order goes to a supplier. Here are the seven documents a small factory uses and what each one changes in stock.

Nov 14, 20267 min readRead

Enterprise Systems

ERP Software in Pakistan: Options, FBR Rules, How to Choose

ERP software in Pakistan comes in four forms: international packaged products, open-source systems, local packages and custom-built ERP. This guide compares them, lists what sales tax, FBR digital invoicing, withholding tax and payroll rules ask of the system, and gives a scorecard for choosing.

Nov 10, 202610 min readRead

Enterprise Systems

ERP in Accounting: What the ERP Accounting Module Does

ERP in accounting means the finance module of an ERP system: a general ledger fed by payables, receivables, cash, fixed asset and tax ledgers, with sales, purchasing and stock posting to it automatically. This guide covers the components, the posting flow, a worked example and a scoping checklist.

Nov 10, 202610 min readRead

Showing 1–13 of 253 articles

Start a conversation

Tell us how your business works.

Describe what is slowing your team down. We will help you work out what to build, and how a free pilot lets you judge our work before the full project.

Prefer WhatsApp? Start a chat

What happens next

  1. You send a short brief

    The problem, the people involved and any target date. A senior engineer replies within 4 business hours.

  2. We understand your workflow

    A first call about how your business works today. An NDA can be signed before you share details.

  3. You test a free pilot

    You choose 2 to 3 key modules and we build them first, so you judge real software before the full project.